The tilers have been working for the last two days, and we now have the bathroom floors and laundry floor tiled, as well as the splashback in the kitchen. The grouting should continue tomorrow. The main bathroom wall tiles are in place and waiting to be grouted also. We are very happy with the floor tiles but not sure about the splash back as it looks a little dull. hopefully the paint will improve this. No photos yet, but we will try and get some on the weekend.
Thursday, March 18, 2010
Friday, March 12, 2010
Kitchen installed!
Tuesday, March 2, 2010
Fixtures
The carpentry continues this week. All the doors (except the rumpus room) have now been fitted including it architraves. The first picture it a closer look at the main bedroom door, the 2nd is the guest room. You can see the doors (including the cupboards) have all been fitted.


Allegedly the kitchen should be in this week so I thought it worthy of a before shot.

Finally a photo of the completed tank. We actually had 2 loads of water delivered today. This is required before they back fill the dirt around it. I guess 28 tonnes of water should keep it in place!
Allegedly the kitchen should be in this week so I thought it worthy of a before shot.
Finally a photo of the completed tank. We actually had 2 loads of water delivered today. This is required before they back fill the dirt around it. I guess 28 tonnes of water should keep it in place!