Initial inspection completed





















Yesterday we met with builder Steve to do an initial walk through of the house to identify what items were left for
completion. It was lovely to go through the house with it being almost completed, it is really starting to feel like our home. The news is that we could have the keys in two to three weeks, and we are busy lining up tilers ready to come in once we have the keys. Enjoy the new photos!

Garden Beds


Thanks to the hard work of some very generous friends we now have three garden beds! Two have been planted with vegetables, including garlic, spinach, cauliflower and lettuce. One has been planted with 100 tulip bulbs ready for our own mini floriade.

The garlic is on us!

Wednesday, May 5, 2010

Final touch ups coming along!

Things appear to be slowing up a bit now that it is closer to finishing. However a few things where done today. Installment of the door handle (which is kind of ugly - but there wasn't any choice), sink tap, drains for outside and the gas bottle. We could see the pump and cover are waiting inside for installation (possibly tomorrow when the gas gets connected).

We should have our first of the walk throughs with the builder either late this week or next. Getting pretty close now. We are both getting more and more excited.




Garage door with 3 bolts.


Garage door with 8 bolts.